Popular Articles

  1. Hazard

    AWM Table :   Bridges Attribute:   Hazard Purpose:   To identify features on or near the road that may increase the risk of accidents or reduce driver awareness, so they can be considered in safety assessments, maintenance, ...
  2. User Management

    Why permissions are important Data protection is extremely important and needs to be managed carefully.  Within any organisation there will be many RAMM users with varying roles and responsibilities.  The permissions in RAMM around access, and w...
  3. Asset Handover Management

    Introduction Effective management of infrastructure assets is crucial for optimising outcomes and ensuring cost-effective operations over the asset's entire life. A critical part of this involves the asset handover process , which is the final t...
  4. AWM Working with Records

    Open a record Click on the record on the map. If there are multiple records at that location, navigate through to the record you need using the arrow buttons on the bottom right of the pop-up. Click on the button on the left side of the pop-up t...
  5. Collection of Inventory Information - Work Instruction

    Collection of Inventory Information Bridge inventory information can be collected at office or during inspections, which are commonly carried out after construction or reconstruction of a bridge but can also be done directly before condition as...
  6. Road Roughness (TotalPave) - Collection Process

  7. Length Adjustments

    This article demonstrates how to adjust the dimensions for a record. This may be needed when the actual length drawn is different from the calculated length (end location - start location) for the record. This is expected for records that either are...
  8. Traffic Direction

    AWM Table :   Bridges, Causeway, Major Culvert, Tunnel Attribute:   Traffic Direction Purpose:   To support consistent recording and management of road data, inspections, and maintenance by clearly defining increasing, dec...
  9. Smart Flags

    The use of a “safety” Smart Flag must  be used if, in the opinion of the Inspector, a defect impacts the integrity of the structure to such a degree that the safety of the public or structure are jeopardised. The addition of a smart flag and dete...
  10. HOW TO - Project Monitoring

    Step-by-Step Guide Video The video below provides a guide on the Monthly Project Monitoring process. It is taken from a recording of an online training session held on 28/01/2025. Apologies for the random start and finish as we only saved the bes...