| AWM Table: | Bridges |
| Attribute: | Analysis Method |
| Purpose: | To record the level of assessment applied to the road or structure, helping users understand the reliability and detail of the information used for planning, design, or condition evaluation |
| Value | Description |
|---|---|
| Preliminary | A basic or early-stage assessment using limited data or assumptions; suitable for initial planning or screening |
| Rigorous | A detailed and thorough analysis using site measurements, calculations, or technical modelling. |
| Not Analysed | No analysis has been carried out for this asset or section. |
| Other | The assessment method used does not fit into the listed categories and may involve alternative or non-standard approaches. |
| Unknown | The type or level of analysis is not recorded or cannot be determined. |