Popular Articles

  1. Superstructure Cross Section

    AWM Table :   Bridges, Bridge Span Attribute:   Superstructure Cross Section Purpose:   To describe the type of structure used to carry the road or pathway across a span (such as a bridge), which helps with design classificatio...
  2. Parapet Type

    AWM Table :   Bridges Attribute:   Parapet Type Purpose:   To identify the type of parapet used on a bridge, which helps assess safety features, containment capability, and maintenance needs. Parapets provide edge protection...
  3. Network Video - Vehicle Setup Instructions

    Case Contents GoPro Max 2x batteries GoPro dual charger GoPro Remote (if not using phone) SD cards (in case) Selfie Stick Lens caps Suction mount Turn key GoPro case Wet wipes Phone holder (if using phone) 4-port Belkin charg...
  4. Sealed Road Roughness (TotalPave) - Specification for Data Collection Survey

    Article Purpose To provide the technical requirements and specifications to undertake a survey for the collection of road roughness data using the TotalPave App. Intended Users Any one who is responsible for collecting Roughness ...
  5. Super Restraint

    AWM Table :   Bridges Attribute:   Super Restraint Purpose:   To record the material or system used to restrain the superstructure (bridge deck or beams), which helps assess stability, durability, and maintenance needs of ...
  6. AWM Working with the Grid

    As well as working with the map, which is the most common way of working in AWM, you can also work with the individual layers in a grid environment which can be useful for looking at larger sets of data. Finding the Grid For each layer you add t...
  7. HOW TO - Add a Contract Record into the System

    1. A contract record should also be added to the Project if the Contract already exists or is being negotiated and already has a contract number.  2. To add a contract, you need to click on the ‘Hierarchy’ button next to the details panel. With t...
  8. Traffic Counting - Specification for Data Collection

    Article Purpose To provide specification on a safe and standard method for collecting Traffic Counting Data using Maunal Traffic counting "Tally Method" and MetroCount equipment. Intended Users Anyone who is responsible for setti...
  9. Monitoring Tables - Field Descriptions

    Project Monitoring Group Field Name Description Data entry Required? Identifier Asset ID Auto-generated ID in the System. Auto-generated  - General Project Name The name of the Project ...
  10. Network Video - Collection Process