  1. Bridge Inspections - Collection Process

  2. Applying a Carriageway Filter to an Asset

    To apply a filter to an asset table based on information in the carriageway table (such as province or sealed/unsealed network) the following steps should be followed (note that this article outlines how to apply a filter for province – if you wan...
  3. Tunnels - Lookup Lists & Values

  4. Causeways - Lookup Lists & Values

  5. Road Structures - Common Lookup Lists & Values

  6. Condition Values

    RAMM Table :   most asset tables Attribute:   Condition Purpose:   To provide a standard approach todescribe 5 levels of asset condition. Value Number Description Excellent 1 – only planned maintenance req...
  7. Updates to Project Monitoring process - May 2025

    Due to feedback provided from Department staff, we have made some changes to the Projects and Project Monitoring modules of the AWM System.  This article provides more detail about these updates, including the updated field descriptions. We will ...
  8. PNG RMS Data Standard

    The PNG DoWH RMS Data Standard , accessible at the link below. The Data Stanadard is described and defined by the following two datasets; The Table Register contains a (draft) list of relevant PNG DoWH RAMM database tables. For each table l...
  9. Programme Development for Road Asset Renewals and Replacements

    This article focuses on Programme Development for Road Asset Renewals and Replacements, including commentary on the AWM System, required inputs, data quality impacts, the process, and a data flow diagram. Systems Use in Programme Development (R...
  10. Prepare & Check Equipment

    Step 1 Step 2 Enough time needs to be allowed for any required equpment callibration prior to the start of the survey