Popular Articles

  1. Monthly Project Monitoring - Process

  2. Microsoft365

  3. HOW TO - Monitoring Officer - Project Monitoring Actions

    The Monitoring Officer is the person responsible for collecting data for the project. In most cases this will be the Project Engineer who is also responsible for collating data for the fortnightly project report. If the project is at a Plannin...
  4. Element Condition State Tables

    1. Roadway and Deck Elements The inspector should check: The pavement for unevenness, settlement, or roughness (shown below). Shoulders, slopes, drainage, and the approach guardrail. The deck and sidewalks for various defects, noting the si...
  5. Bridge Inspections - Specification

    Article Purpose To provide specification on a safe and standard method for collecting bridge condition data using Open Data Kit (ODK) data collection systems. Intended Users Anyone who is responsible for setting up or carrying...
  6. AWM Navigation

    Finding a road or location on the network The search bar in the top right corner of the map allows you to quickly jump to specific locations on the map. There are four ways to use the bar (all examples are using Waigani Drive at the main entr...
  7. Parapet Type

    AWM Table :   Bridges Attribute:   Parapet Type Purpose:   To identify the type of parapet used on a bridge, which helps assess safety features, containment capability, and maintenance needs. Parapets provide edge protection...
  8. River Type

    Purpose: To group rivers by type (like straight, meandering, or steep) so we can plan, maintain, and report on them more accurately, Value Description Photo Example Braided A braided river is a type of river channel that consists of...
  9. Network Video - Collection Process

  10. Parapet Material

    AWM Table :   Bridges Attribute:   Parapet Material Purpose:   To record the material used for bridge parapets, which helps assess durability, safety performance, and maintenance requirements over time. Value De...